Project & Heavy-Lift Cargo
Moving Oversized Equipment Without Surprises
Project and heavy-lift consignments carry risk that ordinary cargo does not. A single incorrectly rated lashing arrangement or an underestimated sea state can put a multi-million-riyal unit — and the vessel carrying it — in jeopardy.
We review and approve lashing and securing arrangements, attend the lift and stowage operations, and assess the transport plan against the sea conditions expected on the intended voyage.
Lashing, Securing and Voyage Risk
Approval of securing arrangements is issued only after the calculation, the materials and the actual execution on deck have all been checked against the expected forces of the passage.

Lashing & Securing
Review and approval of lashing calculations, materials and executed arrangements.
Lift Attendance
Presence during lifting and stowage operations of oversized and heavy units.
Weight & Dimension Check
Verification of declared weights, dimensions and centre of gravity before loading.
Voyage Risk Assessment
Assessment of the transport plan against expected sea and weather conditions.
Stowage Planning Review
Technical review of stowage plans for structural and stability implications.
Damage Prevention
Identification of the risks most likely to cause damage in transit, before departure.